On December 20, the winning bid result for the PV module procurement of the 600,000 kW PV project in Bohu County, supporting the Guoneng Bayingolin Pumped Storage Project by Xinjiang Electric Power Bayingolin Power Generation Company, was announced.
The winning bidder for Section 1 is Shanghai Electric Group Hengxi PV Technology (Nantong) Co., Ltd., with a winning bid price of 0.625 yuan/W, while the candidate for Section 2 is Hoshine Silicon Industry Co., Ltd., with a winning bid price of 0.629 yuan/W.
It is reported that the site of the 600,000 kW PV project in Bohu County, supporting the Guoneng Bayingolin Pumped Storage Project, is located in the southern part of Bosten Lake in Bayingolin Mongolian Autonomous Prefecture, approximately 26 km from Bosten Lake. The project land is classified as other grassland, with terrain mainly consisting of flat land and gentle slopes, sloping from south to north. The project is expected to have an AC capacity of 600 MW and a DC side capacity of 600 MWp.
Scope of bidding and section (package) division: The PV module equipment procurement project for the 600,000 kW PV project in Bohu County, supporting the Guoneng Bayingolin Pumped Storage Project, includes two sections. Section 1 requires a supply capacity of no less than 350 MWp, with at least 573,771 pieces of N-type 610Wp modules. Section 2 requires a supply capacity of no less than 250 MWp, with at least 409,837 pieces of N-type 610Wp or higher single-sided silicon bifacial double-glass PV modules, as well as the supply of matching module string connectors, spare parts, and special tools. The scope also includes factory testing, packaging, insurance, transportation to the destination, delivery, training, installation guidance, functionality realization, assistance in project plan optimization, on-site commissioning and testing, participation in trial operation, final acceptance, and responsibility for quality warranty work, as detailed in Chapter 5 of the supply requirements.