The local prices are expected to be released soon, stay tuned!
Got it
+86 021 5155-0306
Language:  

[SMM Electric Furnace Operating Rate] Three Additional Steel Mills Resumed Production This Period, Electric Furnace Operating Rate Up 3.08% MoM

  • Mar 04, 2025, at 8:48 am
[SMM Electric Furnace Operating Rate: 3 Additional Steel Mills Resume Production This Period, Electric Furnace Operating Rate Up 3.08% MoM] According to the SMM survey, as of March 4, the operating rate of 50 major electric furnace steel mills producing construction materials nationwide was 41.3%, up 3.08% MoM; the capacity utilisation rate was 41.46%, up 2.14% MoM; and the daily average production of construction materials was 92,300 mt, up 4,800 mt MoM.
According to the SMM survey, as of March 4, the operating rate of 50 major electric furnace steel mills producing construction materials nationwide was 41.3% (up 3.08% MoM); the capacity utilisation rate was 41.46% (up 2.14% MoM); and the daily average production of construction materials was 92,300 mt (up 4,800 mt MoM).
  • Selected News
  • Scraps & Secondary
  • Construction steel
  • Steel scrap
  • Other steel materials
Live chat via WhatsApp
Help us know your opinions in 1minutes.