The local prices are expected to be released soon, stay tuned!
Got it
+86 021 5155-0306
Language:
SMM
Sign In
Base Metals
Aluminum
Copper
Lead
Nickel
Tin
Zinc
New Energy
Solar
Lithium
Cobalt
Lithium Battery Cathode Material
Anode Materials
Diaphragm
Electrolyte
Lithium-ion Battery
Sodium-ion Battery
Used Lithium-ion Battery
Hydrogen Energy
Energy Storage
Minor Metals
Silicon
Magnesium
Titanium
Bismuth/Selenium/Tellurium
Tungsten
Antimony
Chromium
Manganese
Indium/Germanium/Gallium
Niobium/Tantalum
Other Minor Metals
Precious Metals
Rare Earth
Gold
Silver
Palladium
Platinum/Ruthenium
Rhodium
Iridium
Scrap Metals
Copper Scrap
Aluminum Scrap
Tin Scrap
Ferrous Metals
Iron Ore Price
Finished Steel
Coke
Coal
Pig Iron
Silicon Steel
Others
Futures
SMM Index
MMi
Simandou Iron Ore Project Progress and Year-End Shipment Plan
Mar 20, 2025, at 3:35 am
The Simandou iron ore deposit, located in southeastern Guinea, is one of the largest and highest-grade undeveloped iron ore deposits globally, with measured resources of 4.41 billion mt and an average total iron grade exceeding 65%. The project is divided into northern and southern zones. Weiqiao Group stated that infrastructure development for the northern zone (including a 550-kilometer railway and port connection facilities) is accelerating.
The Simandou iron ore deposit, located in southeastern Guinea, is one of the world's largest and highest-quality undeveloped iron ore deposits, with measured resources of 4.41 billion mt and an average total iron grade exceeding 65%. The project is divided into northern and southern zones. Weiqiao Group stated that infrastructure development for the northern zone, including a 550-kilometer railway and port facilities, is accelerating, with the first shipment of ore expected by the end of 2025; the southern zone, led by Rio Tinto, is expected to deliver its first batch of ore in 2025 and gradually increase to a capacity of 60 million mt per year within 30 months.